- Workshop: 5,212 m².
- Offices + staff facilities: 671 m².
- Equipment room: approximately 80 m².
- Parking area: 1,271 m².
- Enclosed area: 5 ha.
FAULQUEMONT – INDUSTRIAL BUILDING
Area
Equipement / Services
- Partly air-conditioned offices.
- Inside height of the production hall: 7 m.
- 2 gas boilers (workshop with a unit heater, administrative offices with radiators).
- 2 automatic electric gates with automated and controlled barriers.
Availability
- 1st September 2026.
Localisation
Ideally situated in the Faulquemont industrial park: more than 3,500 jobs spread across more than 65 companies in a variety of sectors: automotive subcontracting, construction, metalworking, plastics processing, the manufacture of heating and air-conditioning systems, logistics, healthcare, and waste processing and recycling.
Connections
Roads:
- Access to the A32-E50 and A4-E25 motorways (Paris-Saarbrücken-Frankfurt and Paris-Strasbourg) is 14 km away via the 4-lane RD 910 road with an interchange in the area. RD19 to Metz – RD20 to Saint-Avold – RD910 to Pont-à-Mousson, Nancy.
Railway:
- Passenger and freight services.
- Faulquemont station is on the Paris-Frankfurt line and on the Saarbrücken/Metz TER line.
- 30 km from TGV station.
Airports:
- 30 km from Lorraine airport.
- 45 km from Saarbrücken-Ensheim airport.
- 100 km from Luxembourg-Findel international airport.
- 145 km from Strasbourg-Entzheim airport.
River:
- Metz, Thionville-Illange, Strasbourg and Dillingen ports.
Terms & conditions
Consult us.
Localisation
Ou appellez nous directement au +33 (0)3 87 37 57 80